| 第173行: |
第173行: |
| | | | |
| | ===规划问题=== | | ===规划问题=== |
| − |
| |
| | | | |
| | *[[顺序排序问题 Sequential Ordering Problem]] (SOP) <ref> L.M. Gambardella, M. Dorigo, "An Ant Colony System Hybridized with a New Local Search for the Sequential Ordering Problem", INFORMS Journal on Computing, vol.12(3), pp. 237-255, 2000.</ref> | | *[[顺序排序问题 Sequential Ordering Problem]] (SOP) <ref> L.M. Gambardella, M. Dorigo, "An Ant Colony System Hybridized with a New Local Search for the Sequential Ordering Problem", INFORMS Journal on Computing, vol.12(3), pp. 237-255, 2000.</ref> |
| 第182行: |
第181行: |
| | *单机总加权延迟调度问题 Single machine total weighted tardiness problem (SMTWTP)<ref>M. den Besten, "Ants for the single machine total weighted tardiness problem," Master's thesis, University of Amsterdam, 2000.</ref><ref>M, den Bseten, T. Stützle and M. Dorigo, "Ant colony optimization for the total weighted tardiness problem," Proceedings of PPSN-VI, Sixth International Conference on Parallel Problem Solving from Nature, vol. 1917 of [[Lecture Notes in Computer Science]], pp.611-620, 2000.</ref><ref>D. Merkle and M. Middendorf, "[http://www.ccas.ru/orsot/library/An%20Ant%20Algorithm%20with%20a%20New%20Pheromone%20Evaluation%20Rule%20for%20Total%20Tardiness%20Problems.pdf An ant algorithm with a new pheromone evaluation rule for total tardiness problems]," Real World Applications of Evolutionary Computing, vol. 1803 of Lecture Notes in Computer Science, pp.287-296, 2000.</ref> | | *单机总加权延迟调度问题 Single machine total weighted tardiness problem (SMTWTP)<ref>M. den Besten, "Ants for the single machine total weighted tardiness problem," Master's thesis, University of Amsterdam, 2000.</ref><ref>M, den Bseten, T. Stützle and M. Dorigo, "Ant colony optimization for the total weighted tardiness problem," Proceedings of PPSN-VI, Sixth International Conference on Parallel Problem Solving from Nature, vol. 1917 of [[Lecture Notes in Computer Science]], pp.611-620, 2000.</ref><ref>D. Merkle and M. Middendorf, "[http://www.ccas.ru/orsot/library/An%20Ant%20Algorithm%20with%20a%20New%20Pheromone%20Evaluation%20Rule%20for%20Total%20Tardiness%20Problems.pdf An ant algorithm with a new pheromone evaluation rule for total tardiness problems]," Real World Applications of Evolutionary Computing, vol. 1803 of Lecture Notes in Computer Science, pp.287-296, 2000.</ref> |
| | *资源受限的项目调度问题 Resource-constrained project scheduling problem (RCPSP)<ref>D. Merkle, M. Middendorf and H. Schmeck, "Ant colony optimization for resource-constrained project scheduling," Proceedings of the Genetic and Evolutionary Computation Conference (GECCO 2000), pp.893-900, 2000.</ref> | | *资源受限的项目调度问题 Resource-constrained project scheduling problem (RCPSP)<ref>D. Merkle, M. Middendorf and H. Schmeck, "Ant colony optimization for resource-constrained project scheduling," Proceedings of the Genetic and Evolutionary Computation Conference (GECCO 2000), pp.893-900, 2000.</ref> |
| − | *组车间调度问题 Group-shop scheduling problem (GSP)<ref>C. Blum, "[ftp://nozdr.ru/biblio/kolxo3/Cs/CsLn/Ant%20Algorithms,%203%20conf.,%20ANTS%202002(LNCS2463,%20Springer,%202002)(ISBN%203540441468)(318s).pdf#page=28 ACO applied to group shop scheduling: a case study on intensification and diversification]{{Dead link|date=June 2020 |bot=InternetArchiveBot |fix-attempted=yes }}," Proceedings of ANTS 2002, vol. 2463 of Lecture Notes in Computer Science, pp.14-27, 2002.</ref> | + | *组车间调度问题 Group-shop scheduling problem (GSP)<ref>C. Blum, "[ftp://nozdr.ru/biblio/kolxo3/Cs/CsLn/Ant%20Algorithms,%203%20conf.,%20ANTS%202002(LNCS2463,%20Springer,%202002)(ISBN%203540441468)(318s).pdf#page=28 ACO applied to group shop scheduling: a case study on intensification and diversification]," Proceedings of ANTS 2002, vol. 2463 of Lecture Notes in Computer Science, pp.14-27, 2002.</ref> |
| | *具有序列依赖设置时间的单机总延迟问题 Single-machine total tardiness problem with sequence dependent setup times (SMTTPDST)<ref>C. Gagné, W. L. Price and M. Gravel, "[https://link.springer.com/article/10.1057/palgrave.jors.2601390 Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times]," Journal of the Operational Research Society, vol.53, pp.895-906, 2002.</ref> | | *具有序列依赖设置时间的单机总延迟问题 Single-machine total tardiness problem with sequence dependent setup times (SMTTPDST)<ref>C. Gagné, W. L. Price and M. Gravel, "[https://link.springer.com/article/10.1057/palgrave.jors.2601390 Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times]," Journal of the Operational Research Society, vol.53, pp.895-906, 2002.</ref> |
| | *具有序列依赖设置/转换时间的多级流车间调度问题 Multistage flowshop scheduling problem (MFSP) with sequence dependent setup/changeover times<ref>A. V. Donati, V. Darley, B. Ramachandran, "An Ant-Bidding Algorithm for Multistage Flowshop Scheduling Problem: Optimization and Phase Transitions", book chapter in Advances in Metaheuristics for Hard Optimization, Springer, pp.111-138, 2008.</ref> | | *具有序列依赖设置/转换时间的多级流车间调度问题 Multistage flowshop scheduling problem (MFSP) with sequence dependent setup/changeover times<ref>A. V. Donati, V. Darley, B. Ramachandran, "An Ant-Bidding Algorithm for Multistage Flowshop Scheduling Problem: Optimization and Phase Transitions", book chapter in Advances in Metaheuristics for Hard Optimization, Springer, pp.111-138, 2008.</ref> |
| − |
| |
| | | | |
| | ===车辆路线问题 Vehicle routing problem=== | | ===车辆路线问题 Vehicle routing problem=== |